Brighton College - AVILAStudio
331
portfolio_page-template-default,single,single-portfolio_page,postid-331,bridge-core-2.1.8,ajax_updown,page_not_loaded,,transparent_content,qode-theme-ver-20.5,qode-theme-bridge,disabled_footer_top,disabled_footer_bottom,wpb-js-composer js-comp-ver-6.1,vc_responsive

Brighton College

Date
Category
Education & Sport
About This Project

While working as a project team leader at Fluid Structures LTD, Antonio was involved in the full construction package and RC detailing of the Brighton college new Kai Yong Yeho Building, and academic building comprising 22 classrooms and an experimental room with offices and other spaces for students and staff. Within the project, the main services involved the full structural engineering design and Reinforces concrete detailing of the building structure, including the steel arches that complete the characteristic roof structure of the academic building. The structure was completed in summer 2017 and the building is now operational.

 

Client – Brighton College

Project Cost range: 0 – 10M£